The renovation March 2023

The ancient walls were chipped from old plaster to make them resisted to possible future earthquakes. Many holes were drilled to connect the indoor and outdoor reinforcement.

Wooden beams are ready for installation of the roof structure.

The concrete slab for stabilizing the structure is in place.